Pennsylvania

Road projects, week of July 31, 2022 – Reading Eagle

Long-term

• Until 2023: Smoketown Road at Little Saucony Creek Bridge, Rockland Township, closed.

• Through Aug. 29: Monatawny Road between Pine Forge Road and Grosstown Road, Douglas Township: Closed for bridge repairs.

• Ongoing: Route 10 at Freemansville Road, Cumru Township, intersection reconstruction and redesign, weekdays; permit project.

• In October: Route 737 between Eagle Point Road and Zettlemoyer Road in Maxatany and Greenwich townships, milling, paving and more, 7 p.m. to 5 a.m. weekdays.

• Until Oct. 28: Creek Road closed between Kistler Valley Road and Old Philly Pike, Albany, bridge repairs.

• Through Aug. 19: St. Lawrence Avenue (Route 562) between Shelbourne Road and Sidel Road, Exeter Township, utility work, 9 a.m. to 3 p.m.

Every day

• July 31-Aug. 6: Route 222 between Tech Park Drive and Old Topton Road, Lehigh County, construction, 8 p.m. to 6 a.m.

• August 1-6: Interstate 78 between exit 30 (Hamburg) and exit 35 (Route 143), maintenance, 7 p.m. to 6 a.m.

• Aug. 1-2: Interstate 78 between Exit 19 (Route 183) and Exit 23 (Shartlesville), maintenance, 7 a.m. to 3 p.m.

• Aug. 1-2: Tulpehocken Forge Road between Water Street and Quarry Road, Heidelberg Township, drainage, 7 a.m. to 3 p.m.

• Aug. 1: Interstate 78 between Exit 23 (Shartlesville) and Exit 35 (Route 143), trash pickup, 7 a.m. to 3 p.m.

• Aug. 2-5: Garfield Road between Route 61 and Plum Creek Road, Center and Antelani townships, drainage, 7 a.m. to 3 p.m.

• Aug. 2-5: Route 222, Paper Mill Road to Route 724, Spring Township and Wyomissing, night operation, 7 p.m. to 6 a.m.

• Aug. 3-4: Shoemakersville Road between Olinger Road and West Shore Drive, Antelani and Maidencreek townships, drainage, 7 a.m. to 3 p.m.

• Aug. 4: Interstate 78 westbound between Exit 23 (Shartlesville) and Exit 19 (Route 183) widened, 7 a.m. to 3 p.m.

• Aug. 5: Route 562 between Chauffers Road and Ollie Line Road, Exeter Township, drainage, 7 a.m. to 3 p.m.

• Aug. 5-7: Route 222 between Paper Mill Road and Route 422, Wyomissing, construction, 7 p.m. to 10 a.m., 3 p.m.

• Aug. 8: Route 422/222 interchange ramps, Wyomissing, bridge inspection, 9 a.m. to 3 p.m.

• Aug. 9: Old Church Road between Route 183 and North Heidelberg Road, North Heidelberg Township, Bridge View, noon to 4 p.m.

• Aug. 9: Heidelberg Road between Route 183 and Christmas Village Road, North Heidelberg Township, bridge inspection, 9 a.m. to 3 p.m.

• Aug. 10-12: Interstate 78 between Exit 40 (Route 737) and Exit 29 (Route 61), bridge inspection, 9 a.m. to 3 p.m.

• Aug. 18: North Wyomissing Blvd., Wyomissing Bridge View, 9 a.m. to 3 p.m.

• Aug. 22: Route 222 between Route 422 and Route 724, Spring Township, bridge inspection, 9 a.m. to 3 p.m.

• Aug. 25: State Hill Road between Woodland Road and Penn Avenue, Wyomissing, bridge inspection, 9 a.m. to 3 p.m.

https://www.readingeagle.com/2022/07/31/road-projects-week-of-july-31-2022/

Back to top button